Some of the items still to be completed:
Wiring in Girl’s Cabins 1 and 2
Trim work (eaves and soffits) on several cabins on Girl’s Side
Eave/Soffit damage to be repaired on a couple Boy’s side cabins
Cleaning of all Girl’s Cabins and bunks moved back in cabins
Pressure washing of Boy’s Side buildings
Exterior Painting of buildings (Boy’s and Girl’s Sides)
Pool fence rebuild
“Amanda” Pavilion to be completed